North Zhejiang Province ~ Fuzhou 1000kV HVAC Transmission Line Project |
South Hami~Zhengzhou ±800kV HV DC Transmission Line |
Xiluodu - West Zhejiang ±800kV HV DC Project |
Lingzhou~Shaoxing ±800kV HVDC Transmission Line Project |
Xishan - Dongjiao 750kV Transmission Line of northwest backbone network 750kV |
Ningxia Gangou Angle-Tower - Shahu 750kV double-circuit transmission line project. |
Jinping 500kV Outgoing Transmission and Transformation Project Sichuan Jinping 500kV Transmission Line Project Package 1Guandi Hydroelectric Power Station - Xichang Substation as well as Xichang Substation - Xichang Converter Station 500kV transmission line project. 862km in full length, which include the transmission line of Guandi Hydroelectric Power Station - Xichang Substation - Xichang Converter Station. It is the first time that FEDI wins the bid for design project in SGCC s centralized tender. |
Longyan Zhuoran ~Sanming Sanyang 500 kV Transmission Line Project By completing the design of Fujian 500kV transmission line, it realizes macro ring network of 500kV lines that guarantees reliable power supply of the 500kV core backbone network and supports the construction of West Coast Economic Zone.14. Fujian 500kV West Macro Ring Network & Longyan 500kV Transmission and Transformation Project feasibility study report won the Second Prize of Power Sector Consultation Achievement Award; two technologies won Gold Award of Two Sides of the Taiwan Straits Employee Innovation Achievement Show. |
Putian LNG Power Plant ~Putian 500 kV Single/Double-Circuit Transmission Line Project |
Jinjiang~Dayuan 500 kV Single / Double - Circuit Transmission Line Project |
|